Septic system maintenance

Effluent filter

Give J&L Underground Construction a call for all of your septic needs we will put you on our schedule to make sure your Advanced Septic System is up to par and running great for the holidays. Please don’t get caught on Christmas Eve with a septic back up over a clogged filter! 417-456-0551

EXPOSING UTILITIES CARTHAGE MISSOURI

SPROULS CONSTRUCTION CONTACTED US TO POTHOLE/EXCAVATE DUE TOO FIBER OPTIC AND GAS LINES IN THE DIGGING LOCATION WHERE THE STATE HIGHWAY SIGNS WERE TO BE PLACED.

DIRECTIONAL DRILLING ,WALKER MISOURI

WE DRILLED A FOUR INCH CONDUIT UNDER NORTH 6TH STREET IN WALKER MISSOURI FOR THE RAILROAD.

PRIVATE UTILITY LOCATING

THE OWNER OF GRACIE’S CAMPGROUND IN PINEVILLE MO CALLED US TO LOCATE SOME OF THERE UNDERGROUND ELECTRIC UTILITIES BEFORE HAVING SOME EXCAVATING DONE ON THERE PROPERTY

Backhoe Work for Suddenlink

We got the the call from Suddenlink Communication that main line had went down on Landis rd in Neosho MO.So we placed new 500 u/g cable and we used a directional drill to bore the drive ways and we used backhoe to trench due to rocky conditions.

FIBER EXPOSED AT 7 INCHES IN NEOSHO MISSOURI

The new Loves gas station in Neosho, MO needed to widen the road that leads into the gas station. Construction became dangerous when they realized that there were major utilities in their way. They contacted us to expose a phone line and a fiber line that was only 7″ deep from the surface of the road. They could have easily pushed a rock into the fiber and damaged it costing them thousands of dollars. Luckily, they were able to finish the road construction cautiously by working around the lines that we had safely exposed.

DIRECTIONAL DRILLING AT STARBUCKS ,JOPLIN MISSOURI

WE WERE CONTACTED BY TENDER LAWN CARE & QUALITY LAWN SERVICE TO DIRECTIONAL BORE PARKING LOT OF STARBUCKS .THEY NEEDED A 2 INCH SLEEVE INSTALLED .SO THEY COULD INSTALL SPRINKLERS ON EACH SIDE OF PARKING LOT .THIS JOB HAD TO BE DONE AFTER STORE WAS CLOSED. WE HAD TO EXPOSE THE SEWER LINE THAT WAS IN THE MIDDLE OF PARKING LOT.BEFORE THE BORE WAS STARTED WE HAD EXPOSED THE SEWER LINE,AND ONCE WE HAD FOUND THAT IT WAS AT 3 FEET DEEP WE THEN DRILLED OVER IT AT 2 FEET DEEP AND FINISHED THE JOB.

INDOOR UTILITY EXCAVATING,NEOSHO MISSOURI

WE GOT THE CALL FROM OTTEN PLUMBING THAT LAZY BOY FACTORY HAD A DRAIN LINE THAT WAS CLOGGED UNDER THE BUILDING.SO WE BROUGHT OUT OUR POT HOLE EXCAVATOR.WE HAD TO HAVE A HOLE CUT INTO THE WALL TO ACCESS THE FLOOR.SO THEN WE EXPOSED THE DRAIN AND HELPED UNCLOG IT,AND PRODUCTION WAS NEVER SHUT DOWN!